专业的煤气发生炉厂家!郑州科能机械制造有限公司欢迎您!

郑州科能机械制造有限公司

郑州科能机械制造有限公司联系方式
公司新闻

煤气发生炉检修时安全注意事项内容Contents of safety precautions for gas furnace overhaul

   煤气发生炉煤气站在停产检修时,是安全事故高发时期,极易发生中毒、着火、爆炸事故。只有严格执行维修安全规程,精心组织维修力量,切实按照维修方案进行工作,才能避免各类事故的发生。检修安全注意事项包括以下内容:

    1)两段式煤气发生炉煤气站停产检修时,要制定检修方案,同时制定切实可行的安全措施,并征得单位领导和当地安监部门的批准许可。

    2)全站停产后要及时组织力量,对全部煤气生产设备进行吹扫置换。

    3)进入煤气设备和管道内工作时,应先取样分析,一氧化碳含量要小于24PPM(30mg/m³)。若一氧化碳含量超标严禁入内进行维修工作和动火、动电气焊等。

    4)站内要设专职或兼职安全人员,负责检修安全工作。要配备必要的通风式防毒面具或自救器等,并且要配备一定的消防器材。

    5)检修动火接临时电源,维修人员到设备管道内作业时,都要经煤气站站长或相关领导签字批准,安全员到工作现场负责安全监护,然后开展工作。

    6)检修工作全部完成后,要组织相关人员进行验收检查,并对全部煤气生产系统进行气密性试验,合格后交付使用。

    本公司长期出售煤气发生炉、两段式煤气发生炉、回转窑等机械设备,价格合理,质量优,有意者联系!电话:86-13676907460

When the gas station is stopped for maintenance, it is a period of high occurrence of safety accidents, which is prone to poisoning, fire and explosion accidents.Only strict implementation of maintenance safety regulations, careful organization of maintenance force, in accordance with the maintenance plan to work, in order to avoid the occurrence of all kinds of accidents.Safety precautions for maintenance include the following:

1) When stopping production and maintenance of two-stage gas generator gas station, the maintenance plan shall be formulated, practical and feasible safety measures shall be formulated, and the approval and permission of unit leader and local work safety supervision department shall be obtained.

2) Organize forces to purge and replace all gas production equipment in time after the station is shut down.

3) When working in gas equipment and pipelines, samples should be taken first and the carbon monoxide content should be less than 24PPM(30mg/m).If the carbon monoxide content exceeds the limit, it is strictly prohibited to carry out maintenance work, ignition and electrodynamic welding.

4) Full-time or part-time security personnel shall be set up in the station to be responsible for maintenance and safety work.Must be equipped with necessary ventilation gas mask or self - rescue device, and must be equipped with certain fire equipment.

5) When the maintenance personnel are connected to the temporary power supply through the overhaul and work in the equipment pipeline, they shall be approved by the gas station master or relevant leaders with their signatures. The safety officer shall be responsible for the safety monitoring at the work site and then carry out the work.

6) After the overhaul is completed, relevant personnel shall be organized for acceptance inspection, and all gas production systems shall be tested for air tightness, which shall be delivered for use after passing the inspection.

The company long - term sales of gas furnace, two - stage gas furnace, rotary kiln and other machinery and equipment, reasonable price, quality, interested contact!Telephone: 86-13676907460




上一篇:煤气发生炉节能监测技术的应用及选择 下一篇:没有了