专业的煤气发生炉厂家!郑州科能机械制造有限公司欢迎您!

郑州科能机械制造有限公司

郑州科能机械制造有限公司联系方式
公司新闻

4.0米两段式煤气发生炉出售4.0m two-stage gas generator for sale

1、本公司专业从事两段式煤气发生炉的设计、制作、安装、调试等技术服务。型号众多,技术先进,价格合理,有意者联系!电话:86-13676907460

2、两段式煤气发生炉型号有:3.0米、3.2米、3.4米、3.6米、4.0米。

3、煤气发生炉是将煤炭转化为可燃性气体——煤气(主要成分为CO、H2、CH4等)的生产设备。煤气发生炉煤气可以用于工业窑炉的加热,例如:机械工业的锻造加热炉、热处理炉;玻璃工业熔池;砂轮、耐火材料工业的隧窑。

    煤气发生炉安装注意事项:

    1、双钟罩加煤箱

    钟罩与隔板的密封面应严密,不得有缺损或缝隙,安装时注意调整。

    2、探火孔主体与水封盖的密封面应严密,不得有缺损或缝隙。

    3、联接发生炉水管和气管(由用户自备),其工作压力小于0.1MPa,在0.3MPa水压下进行强度试验,要求炉体水套内外壁和法兰结合处等无漏焊和泄露,设备无变形。

    4、发生炉的零部件焊接与法兰连接处安装时均应注意密封性,安装后炉内应在0.3MPa压力下用肥皂水涂抹的方法进行严密性试验,以不冒泡为合格,试验后涂以红丹防锈或其它底漆后再涂以灰色面漆。

    5、加煤箱钟罩、灰盘传动装置、煤提升卷扬装置等活动部分应注意调整中心,使其运转灵活,操作方便,安装后应进行空运转试验,灰盘传动装置应至少连续运转12小时,要求无振动、卡住、杂音等不良现象。

1. The company specializes in the design, production, installation, commissioning and other technical services of two-stage gas generator.Numerous models, advanced technology, reasonable price, interested people contact!Telephone: 86-13676907460

2. Two-stage gas generator models are as follows: 3.0m, 3.2m, 3.4m, 3.6m and 4.4m.

3, gas generator is the coal into combustible gas - gas (the main components of CO, H2, CH4, etc.) production equipment.Gas producer gas can be used in industrial furnace heating, such as: mechanical industry forging heating furnace, heat treatment furnace;Glass industry melting pool;Grinding wheel, tunnel kiln of refractory material industry.

Precautions for installation of gas generator:

1. Double bell jar feeding chamber

The sealing surface of bell jar and clapboard should be tight, without any defect or gap. Pay attention to adjustment during installation.

2. The sealing surface of the main body of the fire hole and the water sealing cover shall be tight without any defect or gap.

3. Connection of furnace water pipe and air pipe (provided by the user), whose working pressure is less than 0.1mpa, strength test is conducted under 0.3mpa water pressure, requiring no leakage welding and leakage of inner and outer wall of furnace water jacket and joint of flange, and no deformation of equipment.

4, the welding parts of the furnace and flange joints installation should pay attention to the sealing, after the installation of the furnace should be under the pressure of 0.3mpa with soap water to carry out the tightness test, to do not bubble is qualified, after the test with red red rust or other primer before the paint with gray finish.

5. Bell jar, ash plate drive device, coal hoist and other active parts should be adjusted to make the center flexible and easy to operate. After installation, empty operation test should be carried out.




上一篇:两段式煤气发生炉安装、调试Installation and commissioning of two-stage gas generator 下一篇:没有了